Empanelled As ESCO With BEE
Awarded First as ESCO BY MEDA
Opel Energy Systems Private Limited
  • newani
  • newani1
  • newani2
  • newani3
  • newani4
  • newani5
  • newani6
  • newani7
  • newani8
  • newani9
  • newani10
  • newani1
1 2 3 4 5 6 7 8 9 10 11 12
 
 
   
 

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Waste Heat Recovery Systems on Furnace :

By using waste heat in exhaust gases from Furnaces. We Can generate steam, hot water, hot air.
 
Product- Non IBR Steam Boiler.
Furnace Exhaust Gas Temperature-250 Deg. C (Boiler Inlet Temperature)
Boiler Outlet Temperature - 150 Deg .C.
Steam Generation - 46 kg/hr.
Heat Recovery - 25000 kcal/hr.
Annual Savings - Rs. 8,64,825.00. (7000 working hours)
Pay Back Period - 8 months.
 
Waste Heat Recovery Systems on Furnace
Waste Heat Recovery Systems on Furnace
Waste Heat Recovery Systems on Furnace
send inquiry
send inquiry
send inquiry
Waste Heat Recovery Systems on Furnace
Waste Heat Recovery Systems on Furnace
Waste Heat Recovery Systems on Furnace
send inquiry
send inquiry
send inquiry
 
 

Waste Heat Recovery Systems on Furnace | Waste Heat Recovery Systems on DG Set Exhausts | Air- Preheaters For Thermopack | Energy Audits | Energy Conservation Projects | Waste Heat Recovery On DG Sets | Fuel saving Devices for all Fuels |
Flux Maxiox Fuel Saving Devices | Thermic Fluid Heating Systems | Waste Heat Recovery On Furnaces | Insulation projects to avoid losses | FO Emulsification Systems | Laddie Preheaters | Heat Treatment furnace | Industrial Burners | Air Source Water Heaters | Heat Pump Dryer | Heat Pumps | Home | Profile | Contact Us | Feedback |

Request A Quote
Google-Play